The second USS Thresher (SSN-593) was the lead ship of her class of nuclear-powered attack submarines in the United States Navy. Her loss at sea during deep-diving tests in 1963 is often considered a watershed event in the implementation of the rigorous submarine safety program SUBSAFE. The contract to build Thresher was awarded to Portsmouth Naval Shipyard on 15 January 1958, and her keel was laid on 28 May 1958. She was launched on 9 July 1960, was sponsored by Mrs. Frederick B. Warder, and was commissioned on 3 August 1961, Commander Dean L. Axene commanding. Accompanied by the submarine rescue ship Skylark, she sailed to an area some 190 nmi east of Cape Cod, Massachusetts, and on the morning of 10 April started deep-diving tests. As Thresher neared her test depth, Skylark received garbled communications over underwater telephone indicating "... minor difficulties, have positive up-angle, attempting to blow." When Skylark received no further communication, surface observers gradually realized Thresher had sunk. Publicly it took some days to announce that all 129 officers, crewmen, and military and civilian technicians aboard were presumed dead. After an extensive underwater search using the bathyscaphe Trieste, oceanographic ship Mizar and other ships, Thresher's remains were located on the sea floor, some 8,400 ft below the surface, in six major sections. The majority of the debris had spread over an area of about 134,000 m2. The major sections were the sail, sonar dome, bow section, engineering spaces section, operations spaces section, and the stern planes. Deep sea photography, recovered artifacts, and an evaluation of her design and operational history permitted a Court of Inquiry to conclude Thresher had probably suffered the failure of a joint in a salt water piping system, which relied heavily on silver brazing instead of welding; earlier tests using ultrasound equipment found potential problems with about 14% of the tested brazed joints, most of which were determined not to pose a risk significant enough to require a repair. High-pressure water spraying from a broken pipe joint may have shorted out one of the many electrical panels, which in turn caused a shutdown ("scram") of the reactor, with a subsequent loss of propulsion. The inability to blow the ballast tanks was later attributed to excessive moisture in the ship's high-pressure air flasks, which froze and plugged the flasks' flowpaths while passing through the valves. This was later simulated in dock-side tests on Thresher's sister ship, Tinosa. During a test to simulate blowing ballast at or near test depth, ice formed on strainers installed in valves; the flow of air lasted only a few seconds. Air driers were later retrofitted to the high pressure air compressors, beginning with Tinosa, to permit the emergency blow system to operate properly. [READ THE REST OF THIS ARTICLE]
wikisnaps.com is not affiliated with or endorsed by wikipedia. wikipedia and the wikipedia globe are registered trademarks of wikipedia.org. article content reproduced in compliance with wikepedia's copyright policy and gnu free documentation license